Concrete Services
James B. Hunt Jr. Library
Located in the heart of North Carolina State University’s campus, the James B. Hunt Jr. Library is a multi-award-winning library that primarily serves students, faculty, and staff in engineering, textiles, and other science programs. To say that this library is…
First & Main Parking Deck
Located on the southeast corner of First and Main Streets in historic downtown Louisville, this parking deck was constructed to meet the demand created by development in the area and events at the waterfront and convention center. The structure features…
Bowery Street Parking Deck Expansion
The project included a 65,000 sq. ft. expansion to the east of the existing parking deck consisting of a slab-on-grade level and two elevated decks. Construction also included an 88,000 sq. ft. addition above the existing structure consisting of two…
Opportunity Park Parking Deck
This structure marks Donleys second Design/Build garage project for the City of Akron. The 900-car, 313,936 sq. ft. parking facility is constructed of post-tensioned, cast-in-place concrete. Donleys work consisted of demolition of the existing North garage and ramp, and the…
Technical Center Parking Deck
Donley’s was the Design/Builder for this 475-car parking deck to accompany Bridgestone’s new Technical Center in Akron. The four-level structure is constructed of cast-in-place, post-tensioned concrete and features LED fixtures. The Donley team’s design complements the new Technical Center through…
Rappahannock River Parking Deck
The original 520,000 sq. ft. Rappahannock River Parking Deck proposed by Donley’s team utilized a reduced footprint to provide maximum space for future academic buildings, while being able to house 1,663 vehicles (13 more than the RFP required) on five…
JJ South Office Building & Parking Deck
As a result of the Cleveland Clinic’s selection of the site occupied by its main parking deck as the optimal site for its new Heart Center, a new parking deck needed to be constructed to replace the existing one before…
Bucyrus Community Hospital
The two-story north addition to the Bucyrus Community Hospital serves as the new main entrance for the hospital and features: a new emergency department patient registration area four new operating rooms a new gift shop pre- and post-op areas a…
Innovation Way Parking Deck
This 2,939-space parking deck serves Goodyear’s new world headquarters facility and features covered parking for all spaces. In addition to the parking deck, Donley’s was responsible for the construction of the 320 ft. enclosed pedestrian bridge that connects the deck to the headquarters…
Global Center for Health Innovation & Convention Center
The Global Center for Health Innovation & Convention Center project is the first of its kind to integrate the convenience of a modern convention center in a downtown urban setting with a state-of-the-art facility designed to showcase new technical medical…