Student Union
Donley’s Concrete Group has begun work on a 9.8-million-dollar project with over 15,000 cyds of concrete. The project will be working for a joint venture team consisting of TA Loving and Barnhill. The finished student union will measure 209,000 sq. ft. and include a 700-space parking deck adjacent to the union. The concrete portion of this project consist of pile caps, foundation walls and elevated cast in place decks.